To maintain a wet edge, start near a corner and run the roller up and down the full height of the wall, moving over slightly with each stroke. Move backward where necessary to even out thick spots or runs. Don’t let the roller become nearly dry; reload it often so that it’s always at least half loaded. Keep the open side of the roller frame facing the area that’s already painted. That puts less pressure on the open side of the roller, so you’re less likely to leave paint ridges when doing DIY wall painting.
Recently I had the outside of my home painted. The contractor wrote a good contract, but I failed to realize that some things were not in it. It reminds me of the car dealer who offered a good price on a new car but failed to mention that it did not include tires. My contractor failed to specify that lattice under a porch was included. So the painters did not paint it. To his credit, he did instruct them to paint it when I brought it to his attention. If I had the job to do over again I would look for an individual who came with referrals from happy customers rather than a franchise owner..
OF the different type of customers there are at least two: cheap charley's and people who want great results. I agree the need for wall repair is critical to the end results. Most critical is for the customer to be told ahead that the walls are going to need exactly what is needed. This means the contractor must look, touch, examine the walls for defects and needed work. I've been a building manager for 40 years and seen a few paint jobs. Typically a contractor does a lot of talking about how expert he is, but the guys who walk through with note pads, iPads, examine, measure, point things out, explain and recommend are the ones I will deal with. It confirms if they know what the business. Nobody likes the workers to show up and when you talk about the job they're going to do they know nothing but they we were told to be here. Their boss who bid the job doesn't supervise - a big no no around here. Nobody likes surprises or worse, at the end of a job that's not right getting a bunch of little kid excuses. Contractors that do not like the customer to be around looking at the progress don't get the job.
To paint a large section without leaving lap marks, roll the nearly dry roller in different directions along the dry edge, feathering out the paint as you go. After completing the entire length of the wall or ceiling, move to the next section and paint over the feathered edges. For the second coat, apply the paint in the opposite direction. This crisscrossing paint application sharply reduces (if not eliminates) lap marks.
Never, never hire "Hanks painting" , he is a scam. He charged me 1800 for an 800 sqft house, with the agreement of painting the gutters. He not only didn't paint the gutters, the paint of the walls and front door is pealing off. He did not sand the door and the wall color is washing off. His people don't know the work and he much less than them since he painted the door.
Painting your home, both inside and out, improves its curb appeal, character and resale value. Painting is one of the quickest and easiest ways to give your home a face-lift -- and it yields some of the most dramatic results as well. If you have ever visited the painting section of your local hardware store, you know how overwhelming the multitude of paint choices can be. In addition to colors, there are finishes, stains, maintenance and other options to consider. And, if you're interested in adding a mural or trompe l'oeil, you're looking at a whole different set of choices and associated costs.
A qualified exterior house painter can walk you through the process of getting your house ready for a new coat of paint, from scraping and sanding to patching and priming. A pro can also recommend the best exterior paint for the job, whether your siding is wood, fiber cement, stucco, vinyl, or even metal. When it comes to getting the work done, your painter will arrive with all the tools and equipment needed to get the job done quickly, correctly and safely.
Yes the pricing does change, and quite significantly. I have worked inside the paint industry on counter sales outside sales and application for over 10 years. One thing many people do not understand is, the resins in the paint are more expensive to produce the higher the sheen goes. Therefore the company is at of higher cost making the paint, which in terms they charge more for the paint. I have seen a 15$ variance between flat-semi-gloss it is not uncommon and is not unrealistic to pay more for a higher sheen. Another thing to add is when doing samples on your wall prior to a painter coming is a good idea, however do not do them in huge squares with heavy coats, remember you are just wanting an idea. A lot of times the issue comes up of the paint not covering the sample coats, in fact it is covering quite well, however the paint sample applied is often times much darker than the wall color, creating a contrasting difference from the lighter surrounding wall and the sample placed on the wall. I recommend getting a piece of sheet rock and using it for the samples so you can move around with it etc.
When painting the trim, you don’t have to be neat. Just concentrate on getting a smooth finish on the wood. Don’t worry if the trim paint gets onto the walls. You’ll cover it later when painting the walls. Once the trim is completely painted and dry (at least 24 hours), tape it off (using an “easy release” painter’s tape), then paint the ceiling, then the walls.

I do not mean to come off with an edge, however, this is an article for people hiring low bid, uninsured, one man band painters out to "hustle" a buck. Hire reputable, established companies or hire someone you know or have a strong referral from. If you are arguing over watered down paint, ticky, tacky deposits, buying your own supplies, you have hired the wrong guy.
Remember: You want to get the highest quality paint your budget will allow to ensure its lasting beauty. You'll also need painting supplies like primer, brushes, rollers and painter's tape. A professional will have these items on-hand. According to statistics, paint and other supplies account for about 15 percent of a professional painter's total cost; labor will factor into 85 percent of their charges.
Hello, I have a sad situation to share -- a friend of mine who is a very good painter, experienced too, fell off a tall ladder that did not have "boots" on it. (I've never seen those.) Anyway, do you think he should have asked for boots before painting? Possibly it was a situation where he was shy to ask because he wanted the job... (I don't know all the details.)
There’s a new classical station in town, and I listen even though the reception doesn’t seem to be as strong. In our absence, I hope you will avail yourself of other fine magazines and resources to keep up, maybe you’ll see me back in the industry sooner or later. Going out of business due to advances in digital technology isn’t new—I was just reading about the Pony Express succumbing to the much cheaper and faster telegraph in 1861.

So why not just paint your own home. I'm not a painter, so my wife and I take our time, buying the paint and supplies, and doing our own painting. Yes, we need to tape, and it's not perfect, but we get the satisfaction of seeing our completed work. Get the supplies, sliders for your furniture, and patience and go for it. That way YOU have control over the entire project.


Second coats on similar colors are almost never recogicnized as being needed until the coat is applied and has dried. ONLY THEN WILL YOU SEE WHETHER IT NEEDS A SECOND COAT or not. Yes, painters can use a cheaper paint then what you paid for. That is solved by getting your own which, I would charge extra for because I will always have to go get more, or add second coat because home owner tried to skimp on paint, or they got the wrong color etc...
Our profession is competitive but the way we go about our business is anything but normal when it comes to servicing our client’s homes. We take pride with every single exterior or interior painting project that we undertake because we understand that we only get one chance to prove ourselves to you and your neighbors concerning your house paint project so we make it count, every time.
The PPG logo is a registered trademark and Colorful Communities and We protect and beautify the world are trademarks of PPG Industries Ohio, Inc. © 2019 PPG Industries, Inc. All Rights Reserved. | Legal Notices & Privacy Policies | CA Transparency in Supply Chain Disclosure | Global Code of Ethics | TISC for PPG Architectural Coatings UK Limited | TISC for PPG Industries (UK) Limited | PPG Industries UK Ltd 2017 Gender Pay Gap Report
Ask companies to include all details in writing. Although that sounds simple enough, too many contractors submit offers such as "paint house for $5,000." A friendly contractor may offer a reassuring handshake and promise that the crew will take care of all the details — starting on time, working every day, cleaning up, etc. That's great, but why not include each point in the proposal? If it's a challenge to get a written description of labor, materials and other details, things will probably get worse when the work starts.
We’d love to discuss your interior painting needs and provide a cost estimate and plan to meet your dreams. At Home Painters Toronto our goal is your 100% satisfaction. We deliver a professional end result you can be proud of, so we can be proud of it too. Our professional painting crew will make your interior painting project seamless and easy for you. Let us do our job, so you don’t have to.
I am a painting contractor and have been since 2001. Make sure the estimate provides in writing: What is EXCLUDED as well as INCLUDED. It should state the manufacturer and type of paint going to be used. Estimate says ALL LABOR AND MATERIALS. My estimates to my customers say "guaranteed coverage" eliminates the conversations of 1 coat vs 2 coat. I have my customers submit colors 5 days prior to start date. Customers need to inform me if they are going to use pure white, dark reds, oranges, and bright yellows they need to inform me in that 5 day window, so I can adjust my pricing for 3 coats. Although this more uncommon now than years past because a lot of paint manufacturers have primer with paint products. Let the contractor know if your doing accent walls. This takes longer to cut in straight lines and it requires the contractor to purchase more paint. If you add anything on the scope of work have the painter write out the description and cost prior to them doing the work. Have the estimate say how many days it will take to perform the work. Ask how many workers will be doing the job. Make sure to enforce that number of workers their everyday until the job is complete. Do not give final payment until you do a final walk through. Walk the job when its almost complete and point out areas that you want fixed prior to the contractors final walk through. Its best to do while the workers are still in that particular area as they will have tarps down and areas covered and it will be easier for them to take care of. Purchase a roll of blue tape and stick it to areas that you want fixed. This is called a punch list.
The PPG logo is a registered trademark and Colorful Communities and We protect and beautify the world are trademarks of PPG Industries Ohio, Inc. © 2019 PPG Industries, Inc. All Rights Reserved. | Legal Notices & Privacy Policies | CA Transparency in Supply Chain Disclosure | Global Code of Ethics | TISC for PPG Architectural Coatings UK Limited | TISC for PPG Industries (UK) Limited | PPG Industries UK Ltd 2017 Gender Pay Gap Report
×